Questions to ask a builder before you hire them
Print one copy per builder and take it to the first site visit. Tick each question once you have a clear answer, and note anything you need in writing. The answers matter, but so does how readily a builder gives them.
designer-builder.co.uk/checklist/questions-to-ask-a-builder/
Builder: ______________________ Date of visit: ____________ Quote due: ____________
1. Company and cover
- Are you a limited company, partnership or sole trader? What is the registered name?Check a company on Companies House: active, accounts filed, no pattern of dissolved companies.
- What is your trading address?A real address, not just a mobile number.
- Can I see your public liability insurance details?Insurer, policy number, cover amount and expiry. £2m to £5m is common.
- Do you have contractor's all risks cover for the works?Or will my home insurance need to cover them? Ask your insurer either way.
- Are you VAT registered? What is your VAT number?Check it on GOV.UK if they will charge VAT.
- Are you a member of any trade body or scheme?Check membership on the scheme's own site, and whether it offers deposit or warranty protection.
2. Team and workload
- Who will be on site each day, and who is my main contact?Name and phone number of the site lead.
- Which trades do you employ and which do you subcontract?Electrician, plumber, plasterer, roofer, groundworker.
- Are your electrician and gas engineer registered to self-certify?Electrics: membership of an authorised self-certification scheme. Gas: Gas Safe registration.
- How many other jobs will you run at the same time?Ask what happens if one overruns.
- When could you start, and how many weeks on site?Get both in the quote.
3. The price
- Will the quote be a fixed price, split by section?Prelims, demolition, groundworks, structure, roof, windows, M&E, finishes.
- Which drawings and revision will you price?All builders must price the same set.
- Does the price include VAT?Write the answer down.
- What provisional and PC sums will you include, and how much?Over about 15% of the price is a lot of guesswork.
- What is excluded?Building control fees, skip permits, kitchen supply, flooring, decoration, garden reinstatement.
- How do you price changes I ask for during the job?Ask for a written price before any change is made.
- How long is the quote valid, and can material price rises be passed on?30 to 90 days is typical.
4. Contract and payment
- Which written contract do you normally use?A JCT Home Owner or Minor Works form is a good sign. No contract is a red flag.
- What deposit do you need, and what is it for?Up to about 10%, linked to materials ordered.
- What are the payment stages?Each stage should match work done. Keep a meaningful final stage.
- Will you agree to a retention, and what rectification period?3 to 5% retention, with 6 to 12 months for defects is common on homes.
- Who is responsible for any design you do?Steel connections, roof design, heating layout.
- What guarantees come with the work and the products?Ask for them to be listed in the contract.
5. Approvals
- Who applies for building regulations approval, and who pays the fees?Full plans is the safer route for an extension.
- Who books the building control inspections?And who gives me the completion certificate?
- Does the work need party wall notices?Excavating near a neighbour or cutting into a shared wall usually does.
- Are there drains under the footprint?If a public sewer runs there, the sewerage company must agree before anything is built over it.
6. Living with the build
- What are your working hours?Check any local restrictions and agree them.
- Where will the skip, materials and vans go?Skips on the road need a council permit.
- Will the crew need my toilet, water and power?Or will you bring welfare facilities?
- How will you protect the rest of the house from dust?Ask what happens when the back wall comes out.
- How will you keep the neighbours informed?A good builder will raise this unprompted.
7. References
- Can I visit two finished jobs from the last year?Ideally similar to mine.
- Can I see one job in progress?A tidy site is a good sign.
- May I phone the owners?Ask about timing, final cost against quote, problems and defects.